Email:zora@sdzssteel.com
Email:sun@sdzssteel.com

logo白1
  • Home

  • Products

    
    • Profile Steel

    • Steel Pipe

    • Steel Plate/Coil

    • Steel Bar

  • About Us

  • Application Cases

  • Certificate

  • News

    
    • Brochure

    • What are the standards for petroleum pipes?

    • What material are manhole covers made of? How to use it?

    • What is the performance of nodular graphite?

    • Is oil pipe anti-corrosion?

  • FAQ

  • Contact us

Products

Home / Products / Steel Pipe / Carbon Steel Pipe

PRODUCT

  • Profile Steel

    
    • Rebar Steel

    • Angle Steel

    • Channel Steel

    • H Steel/I Beam

    • Rail Steel

    • Steel Wire

    • Flat Steel

    • Ductile iron fittings

  • Steel Pipe

    
    • Aluminum Tube

    • Copper Tube

    • Carbon Steel Pipe

    • Galvanized Steel Pipe

    • Stainless Steel Pipe

  • Steel Plate/Coil

    
    • Aluminum Coil/Plate

    • Copper Coil/Plate

    • Carbon Steel Coil/Plate

    • Galvanized Coil/Plate

    • Stainless Steel Coil/Sheet

    • PPGI/PPGL

  • Steel Bar

    
    • Aluminum Rod

    • Copper Rod

    • Carbon Steel Rod

    • Stainless Steel Rod

CONTACT US 

sun@sdzssteel.com
未标题-1
Submit
  • Ductile Iron Pipe
    Ductile Iron Pipe

    —

    Production process:
    (1) Strict requirements for chemical composition, requiring a higher carbon and silicon content in the original molten iron compared to gray cast iron, reducing the content of manganese, phosphorus, and sulfur in ductile iron
    (2) The discharge temperature of molten iron is higher than that of gray cast iron to compensate for the loss of molten iron temperature during spheroidization and inoculation treatment
    (3) Perform spheroidization treatment by adding spheroidizing agents to the molten iron
    (4) Add inoculant for inoculation treatment
    (5) Ductile iron has poor flowability and large shrinkage, so it requires a higher pouring temperature and a larger pouring system size. Reasonable use of risers and chilled iron should follow the principle of sequential solidification
    (6) Perform heat treatment
    Learn More ⇀
  • Cold rolled Carbon steel round pipe
    Cold rolled Carbon steel round pipe

    —

    Carbon steel pipe producing process:
    1. Round pipe billets are cut into billets of approximately 1 meter in length by a cutting machine and sent via a conveyor belt to be heated in a furnace.The billet is heated in the furnace at a temperature of about 1200 degrees Celsius. The fuel is hydrogen or acetylene.
    2. After the round billets come out of the furnace they are pierced by a pressure piercing machine. The more common piercing machine is the conical roll piercing machine. After that, the round billet is successively rolled by three-roll tilting, continuous rolling or extrusion.
    3. After extrusion, the pipe is taken off for sizing. Sizing machine through the conical drill bit rotating at high speed into the steel embryo perforation, the formation of steel pipe. The inner diameter of the steel pipe is determined by the length of the outer diameter of the drill bit of the sizing machine.
    4. After sizing, the steel pipe enters a cooling tower and is cooled by spraying water. After cooling, it is straightened.
    5. A conveyor belt sends the steel pipe to a metal flaw detector (or water pressure test) for internal flaw detection.
    Learn More ⇀
  • Hot rolled Carbon steel rectangular pipe
    Hot rolled Carbon steel rectangular pipe

    —

    Carbon steel pipe producing process:
    1. Round pipe billets are cut into billets of approximately 1 meter in length by a cutting machine and sent via a conveyor belt to be heated in a furnace.The billet is heated in the furnace at a temperature of about 1200 degrees Celsius. The fuel is hydrogen or acetylene.
    2. After the round billets come out of the furnace they are pierced by a pressure piercing machine. The more common piercing machine is the conical roll piercing machine. After that, the round billet is successively rolled by three-roll tilting, continuous rolling or extrusion.
    3. After extrusion, the pipe is taken off for sizing. Sizing machine through the conical drill bit rotating at high speed into the steel embryo perforation, the formation of steel pipe. The inner diameter of the steel pipe is determined by the length of the outer diameter of the drill bit of the sizing machine.
    4. After sizing, the steel pipe enters a cooling tower and is cooled by spraying water. After cooling, it is straightened.
    5. A conveyor belt sends the steel pipe to a metal flaw detector (or water pressure test) for internal flaw detection.
    Learn More ⇀
  • Carbon steel seamless round pipe
    Carbon steel seamless round pipe

    —

    Carbon steel pipe producing process:
    1. Round pipe billets are cut into billets of approximately 1 meter in length by a cutting machine and sent via a conveyor belt to be heated in a furnace.The billet is heated in the furnace at a temperature of about 1200 degrees Celsius. The fuel is hydrogen or acetylene.
    2. After the round billets come out of the furnace they are pierced by a pressure piercing machine. The more common piercing machine is the conical roll piercing machine. After that, the round billet is successively rolled by three-roll tilting, continuous rolling or extrusion.
    3. After extrusion, the pipe is taken off for sizing. Sizing machine through the conical drill bit rotating at high speed into the steel embryo perforation, the formation of steel pipe. The inner diameter of the steel pipe is determined by the length of the outer diameter of the drill bit of the sizing machine.
    4. After sizing, the steel pipe enters a cooling tower and is cooled by spraying water. After cooling, it is straightened.
    5. A conveyor belt sends the steel pipe to a metal flaw detector (or water pressure test) for internal flaw detection.
    Learn More ⇀
  • 5.5m Ductile Iron Pipe
    5.5m Ductile Iron Pipe

    —

    Production process:
    (1) Strict requirements for chemical composition, requiring a higher carbon and silicon content in the original molten iron compared to gray cast iron, reducing the content of manganese, phosphorus, and sulfur in ductile iron
    (2) The discharge temperature of molten iron is higher than that of gray cast iron to compensate for the loss of molten iron temperature during spheroidization and inoculation treatment
    (3) Perform spheroidization treatment by adding spheroidizing agents to the molten iron
    (4) Add inoculant for inoculation treatment
    (5) Ductile iron has poor flowability and large shrinkage, so it requires a higher pouring temperature and a larger pouring system size. Reasonable use of risers and chilled iron should follow the principle of sequential solidification
    (6) Perform heat treatment
    Learn More ⇀
  • API 5D Pipe Fluid Pipe
    API 5D Pipe Fluid Pipe

    —

    Standard:
    API SPEC 5L - American Petroleum Institute
    GB/T9711- Chinese National Standard
    Purpose:
    Oxygen, water, and oil delivery pipes used in the petroleum and natural gas industries
    Main steel pipe grades for production:
    B. X42, X52, X60, X65, X70 L245 L290 L320 L360 L390 L450 L485
    Learn More ⇀
  • <
  • 1
  • 2
  • 3
  • 4
  • >

A Leading Supplier of Steel Materials

For more details please contact by email

Inquiry

Stay Connected

If you have any questions, please contact us and we will reply you as soon as possible.



Link

  • Home

  • Products

  • About Us

  • Contact us

 

Contact Info

zora@sdzssteel.com
sun@sdzssteel.com
未标题-1
Room 2301, Building 7, China ResourcesLand Plaza, No. 68 Gongye South Road,Lixia District, Jinan City, Shandong Province

logo#ffa200
Zhongshi Steel (shandong) Co.,Ltd.

First class quality service and professional after-sales team. 


sun@sdzssteel.com
Room 2301, Building 7, China ResourcesLand Plaza, No. 68 Gongye South Road,Lixia District, Jinan City, Shandong Province

Get in Touch

Submit

*We respect your confidentiality and all information are protected.



sun@sdzssteel.com

zora@sdzssteel.com
